A glazing package that keeps to programme.
Fixed quotation against your schedule. Lead times counted from signed drawings and agreed in writing. One package manager who owns the survey, the deliveries and the installation. No component swaps you didn't approve.
- Budget price5 working days
- Quotationitemised, fixed
- Programmefrom signed drawings
- Installationour own team
- Statuslive in your portal
The risks we take off your package.
Glazing sits on the critical path. It closes the building, and late or wrong frames hold up every trade after them.
Itemised, fixed quotation
Priced line by line against your schedule, with clear exclusions. Early budgets are given as £/m² and per opening for appraisals.
Dates in writing
Lead time runs from signed drawings. Deliveries are phased to suit the build sequence, and you hear about any slip from us first.
Mock-up and inspection
A sample unit or full-size corner for approval before production. Each delivery is checked against the signed drawings.
Live project portal
Every package has a portal page: stage, owner, promised dates, documents and approvals, visible to your whole team without a status call.
Documentation built in
Declarations of performance, PAS 24 evidence, U-value certificates and an as-built register, ready for building control and your records.
From tender to handover
We plan London logistics in from the start: loading bays, parking suspensions and lifting plans.
Budget
Schedule or drawings in. £/m² and per-opening budget out, with value-engineering options listed separately.
→ 5 working daysTender
Itemised fixed quotation, programme and method statement.
→ fixed priceDesign
Survey, shop drawings and interface details, signed off by your design team.
→ signed drawingsManufacture
Made to the signed drawings, with a mock-up approved first and progress reported weekly.
→ phased deliveriesInstall & hand over
Our own installers, snagging, the O&M manual and the as-built register.
→ handover pack
Everything your PQQ asks for, in one pack.
We're assembling our pre-qualification pack as accreditations are confirmed. Request it and we'll send the current version with a cover note on anything still in progress.
| Document | Status |
|---|---|
| Company details & insurances (public liability, employer's liability, product liability) | In progress |
| Health & safety policy, RAMS template, SSIP accreditation | In progress |
| Common Assessment Standard / Constructionline | Planned |
| Installer certification (FENSA or CERTASS) | Planned |
| System test evidence: PAS 24, weather, thermal | In progress |
| Guarantee terms & aftercare | In progress |
| Environmental policy, EPDs where available | Planned |
We show our status openly. Nothing on this list will be claimed before it's in place.