Pre-launch preview. Values marked Indicative are being verified against test certificates.
For developers & main contractors

A glazing package that keeps to programme.

Fixed quotation against your schedule. Lead times counted from signed drawings and agreed in writing. One package manager who owns the survey, the deliveries and the installation. No component swaps you didn't approve.

  • Budget price5 working days
  • Quotationitemised, fixed
  • Programmefrom signed drawings
  • Installationour own team
  • Statuslive in your portal
What you can rely on

The risks we take off your package.

Glazing sits on the critical path. It closes the building, and late or wrong frames hold up every trade after them.

Cost

Itemised, fixed quotation

Priced line by line against your schedule, with clear exclusions. Early budgets are given as £/m² and per opening for appraisals.

Programme

Dates in writing

Lead time runs from signed drawings. Deliveries are phased to suit the build sequence, and you hear about any slip from us first.

Quality

Mock-up and inspection

A sample unit or full-size corner for approval before production. Each delivery is checked against the signed drawings.

Visibility

Live project portal

Every package has a portal page: stage, owner, promised dates, documents and approvals, visible to your whole team without a status call.

See the portal

Compliance

Documentation built in

Declarations of performance, PAS 24 evidence, U-value certificates and an as-built register, ready for building control and your records.

Package process

From tender to handover

We plan London logistics in from the start: loading bays, parking suspensions and lifting plans.

  1. Budget

    Schedule or drawings in. £/m² and per-opening budget out, with value-engineering options listed separately.

    → 5 working days
  2. Tender

    Itemised fixed quotation, programme and method statement.

    → fixed price
  3. Design

    Survey, shop drawings and interface details, signed off by your design team.

    → signed drawings
  4. Manufacture

    Made to the signed drawings, with a mock-up approved first and progress reported weekly.

    → phased deliveries
  5. Install & hand over

    Our own installers, snagging, the O&M manual and the as-built register.

    → handover pack
Pre-qualification

Everything your PQQ asks for, in one pack.

We're assembling our pre-qualification pack as accreditations are confirmed. Request it and we'll send the current version with a cover note on anything still in progress.

Request the PQQ pack

DocumentStatus
Company details & insurances (public liability, employer's liability, product liability)In progress
Health & safety policy, RAMS template, SSIP accreditationIn progress
Common Assessment Standard / ConstructionlinePlanned
Installer certification (FENSA or CERTASS)Planned
System test evidence: PAS 24, weather, thermalIn progress
Guarantee terms & aftercareIn progress
Environmental policy, EPDs where availablePlanned

We show our status openly. Nothing on this list will be claimed before it's in place.

Send the window schedule. A budget comes back within five working days.

PQQ pack Request a quote